BOY ROGER

Main Details
Running number
-
Works number
-
Class
Saddle Tank 0-4-0
Introduced
2009
Rebuilt
Builder
SdR/Mamod/RWM
Owner
SdR
Status
In service

[SHIP'S] BOY ROGER was the second steam locomotive delivered to the SdR in 2009 from the Mamod works in the West Midlands.

Alterations included the fitting of dead-leg displacement lubricator and re-routing the exhaust steam pipe to the chimney. Standard SdR centre buffers and draw gear were also fitted.

This locomotive completed a third major rebuilding project in Dec 2020 and was given a full cab and all-round footplating with new full-width buffer beams. A new Bix fuel tank and associated copper fuel pipe was also installed.

The engine returned to works for yet another complete rebuild. This time she  has:

  • New full height cab
  • New footplating
  • Slight increase in length of loco and extended buffer beams
  • Saddle tank to replace side tanks
  • New chimney
  • High-pressure boiler from RWM Steam
  • New inline displacement lubricator
  • Upgrade wheels by Dream Steam which have been recovered from the No1 rebuild project

Rebuild 2025

  • Mamod chassis replaced by RWM Steam Janet chassis
  • Water level gauge glass blow-down valve fitted
  • Saddle tank fixings redesigned with new brackets
Boy Roger ex-works [19 Aug 2025]
Boy Roger ex-works [19 Aug 2025]
Boy Roger ex-works [19 Aug 2025]