Rebuilt Dot outshopped from Works

Submitted by andrew.sdr on

Explosion proof battery electric mining locomotive "Dot" was outshopped from Low End Works in April 2024 following rebuild.

The following modifications were completed:

  • Extending the frames to accommodate a new and larger driving cab
  • Replacement of electrical control gear with radio control gear supplied by Fosworks 
  • Battery isolation switch (BIS) relocated from the battery box to the cab
  • Weight increased to 2.1Kg for greater adhesion
Dot in Erecting Shop [17 April 2024]
Dot in Erecting Shop [16 April 2024]