Titty to have new chimney

Submitted by andrew.sdr on

Engine No1 currently being rebuilt in Low End Works shall have a new taller chimney. Suitable material has been sourced from scrap 1/2 inch copper pipe left over from the domestic central heating installation back in 1992.

The old chimney has been truncated to leave a short stump which will form the base of the new copper chimney.

The new chimney shall have a brass cap which it is hoped can be sourced from Roundhouse Engineering Ltd in Doncaster.

Titty has her chimney truncated
The new chimney will need to be trimmed down