Recent works done on the project are:

  • New chimney completed with brass cap
  • Cab floor cutouts made to accommodate RWM displacement lubricator tank
  • Cab roof made from sheet steel
  • Hole drilled in firebox end-plate for superheater pipe to pass through the firebox

Works still to do are:

  • Make and fit steel bar to support rear of cab roof
  • Make and install four roof locating pegs
  • Make saddle tank and fix to firebox
  • Install Summerlands Chuffer and exhaust steam pipe
  • Install superheater pipe and displacement lubricator
  • Install boiler, firebox and saddle tank
  • Make and install copper cowl for safety valve in cab
  • Make mounting bracket for fuel tank
  • Fit gas jet
  • Fit new valve to fuel tank
  • Install fuel pipe and fuel tank
  • Paintshop