DOT in works for rebuilding

Submitted by andrew.sdr on

Battery mining loco DOT has been taken out of service and into Low End Works for a rebuild. This will involve:

  • Extending the outside frames to make the loco longer and increase the low level floor area in the cab
  • Replacing/rebuilding the cab
  • Fitting new electrical control gear (speed controller)
  • May require the separate battery for the lights to be resited
DOT in works for rebuilding with extended outside frames
Cardboard pattern for new extended outside frames